There are 2 columns of content to choose from.
Column 1 is narrow and has mostly links to column 1
Column 2 contains the main page content to column 2
Optical Pre-emption & Emergency Traffic Signal
Equipment
District: All
Location: City-Wide
Project Description: Most City intersections
are installed with optical pre-emption and emergency
traffic signal equipment. The traffic signal system
is currently 58% equipped with emergency
pre-emption devices. The goal is to have at least
66% of the system outfitted. This
project will install emergency pre-emption devices
on the remaining intersections and
new signalized intersection additions helping to
ensure safe passage for emergency
vehicles.
Project Cost: $343,933
First Full Year O&M: $25,630
Fiscal Years: 2008/09, 2009/10
Back to Public Safety |
|
|