There are 2 columns of content to choose from.
Column 1 is narrow and has mostly links to column 1
Column 2 contains the main page content to column 2
Mesa Drive: Southern Avenue to US-60 (Superstition
Fwy)

District: 4
Category: Regional Transportation Plan
Project Description:
Currently over 65,000 vehicles pass through the
intersection of
Mesa Drive and Southern Avenue each day. This
exceeds the
capacity of the roadway and results in considerable
congestion,
traffic accidents, and long backups on both Southern
Avenue and
Mesa Drive. This is a Regional Transportation Plan
project to
mitigate traffic delay and congestion and enhance
safety.
Specifically, this project will construct
fully-protected dual left turn
lanes, add a third through lane for each direction
on Southern
Avenue, and a third through lane for each direction
on Mesa Drive
from US-60 through the intersection at Southern
Avenue. It
includes improvements to the storm sewer system to
mitigate
street flooding during storms. Funding for the
improvements to the
storm sewer system will be from general obligation
bonds.
Project Cost: $18,001,066
RTP Reimbursement: $7,023,000
Total Bond Amount: $10,978,066
Reimbursement Outside 5-Year: 0
First Full Year O&M: $15,745
Fiscal Years: 2008/09, 2009/10
Back to Streets
|
|
|