Follow this link to search this site or this link to skip to page content
CityOfMesa.org CityofMesa.org
CityofMesa.org Home Resident Visitor Business City Hall Jobs search
Site search starts here
Submit Website Search
Page content starts here
There are 2 columns of content to choose from. Column 1 is narrow and has mostly links to left column Column 2 contains the main page content to page content Column 3 is narrow and has mostly links to right column
Contract Instructions
 
  • Do not fill in the date listed on the CONTRACT, this will be completed by the City of Mesa at time of execution
  • Do sign both your name and title on the lines provided, this signature does not have to be notarized or sealed

Bond Agent Requirements:

  • FOUR (4) ORIGINAL PAYMENT AND PERFORMANCE BONDS MUST BE SUBMITTED
  • Do not fill in the date listed in the 2nd paragraph of the PAYMENT or PERFORMANCE BOND, this will be completed by the City of Mesa at time of execution
  • Do fill in the date listed in the last paragraph of the PAYMENT or PERFORMANCE BOND, this is the date that your bond agent issues the bonds
  • Do complete the agency of record name, address, phone and fax information on the lines provided
  • Do have your bond agent sign on the line provided.  Agent must affix their seal on each of the PAYMENT and PERFORMANCE BONDS

Contractor Requirements:

  • Do sign each of the PAYMENT and PERFORMANCE BONDS
  • Do corporate seal each of the PAYMENT AND PERFORMANCE BONDS with your corporate seal. If you do not have a seal, please indicate “No Seal” next to the signature line. IF YOU ARE NOT A CORPORATION, EACH PAYMENT AND PERFORMANCE BOND MUST BE NOTARIZED

The City of Mesa CERTIFICATES OF INSURANCE must be completed. Accord forms are not accepted.  Completion includes:

  • A General Certificate of Insurance (.pdf 1 page)
  • A Project Number in the top right hand corner
  • Name of Insured
  • Name of Insurance Carrier, Policy Number, Policy Period and Actual Coverage amount listed for each of the coverages required. Complete each box separately
  • An Owner's Liability Certificate of Insurance (.pdf 1 page) policy for each project (No Exceptions). Also, please note that this coverage is in the City of Mesa’s name not the Contractors
  • No modified language on either form

Contracts can be executed with faxed copies of CERTIFICATES OF INSURANCE, however, originals must follow by mail.