Follow this link to search this site or this link to skip to page content
CityOfMesa.org CityofMesa.org
CityofMesa.org Home Resident Visitor Business City Hall Jobs search
Site search starts here
Submit Website Search
Page content starts here
There are 2 columns of content to choose from. Column 1 is narrow and has mostly links to left column Column 2 contains the main page content to page content Column 3 is narrow and has mostly links to right column
Stormwater Requirements for Construction Sites Operating in the City of Mesa

The ADEQ’s GCP requires that the operator forward a copy of the completed NOI to the owner/operator of the MS4 if the facility has the potential to discharge to the MS4.

The City of Mesa requires all construction projects that are required to obtain AZPDES coverage to submit a copy of the NOI along with all other required information to Building Safety when applying for a building permit (NOTE: Submittal of the NOI, SWPPP, and NOT to the City of Mesa does not negate or replace the operator’s submittal requirements to the ADEQ).

Information Booklet

Complete Packet

By Section